Skip to content

Independent Manufacturing Operations Consulting

Engineered Labor Time Standards for Truss Manufacturers

Replace broad averages, outdated factors, and labor assumptions with clearer work-minute information grounded in the equipment, materials, staffing, and production methods used in your operation.

Todd helps truss manufacturers apply Work Minutes, R.E., S.U., and man-minute standards to support better labor costing, scheduling, staffing, productivity measurement, pricing, and capacity planning.

100+ Wood Truss OperationsStandards tested, validated, and used in operating plants
20+ Years of RefinementDeveloped through full-time consulting work
Practical Labor UnitsWork Minutes, R.E., S.U., and man-minutes

When stronger labor information may help

When Labor Assumptions Limit Better Decisions

Labor information affects much more than payroll. When estimated time does not reflect the work being performed, management may struggle to evaluate job cost, production schedules, staffing, productivity, pricing, and available capacity.

Costing Uncertainty

Labor cost is based on broad factors or historical assumptions rather than estimated time for the work.

Scheduling Friction

Production schedules do not consistently reflect job complexity or expected resource demand.

Staffing Questions

Crew requirements and operating expectations are difficult to compare across equipment, materials, or production conditions.

Productivity Confusion

Management lacks a consistent way to compare estimated labor time with actual performance.

Capacity Blind Spots

Workload and job mix are difficult to evaluate in a common time-based unit.

Outdated Factors

Equipment, materials, layouts, or production methods have changed while labor estimates have not kept pace.

Match the standards to the operation

Build Labor Information Around How the Work Is Performed

The service follows the manufacturer’s equipment, materials, processes, and operating questions rather than applying one unsupported factor to every condition. As relevant to the engagement, Todd may help management:

  • Identify labor-time elements that fit current equipment, materials, and production methods.
  • Use Work Minutes, R.E., S.U., or man-minutes as a consistent labor-time unit.
  • Review how current labor factors support costing, scheduling, staffing, productivity measurement, pricing, and capacity planning.
  • Compare work-minute information with an existing labor-estimation method.
  • Consider how applicable labor-estimation software can use the selected factors.
  • Recognize when standards need validation or revision as operating conditions change.

A clearer unit for labor

Measure Labor in Time—Not a Proxy

Board feet, piece counts, and other production measures can describe material or output, but they do not directly measure labor time. Work-minute standards give management a time-based view of the work expected under defined operating conditions.

Costing & Pricing

Connect estimated labor time with labor cost and evaluate the return expected from different work.

Scheduling & Capacity

Express expected workload in time so management can make more informed production and capacity decisions.

Productivity & Staffing

Compare estimated and actual time using a more consistent basis for operating review.

How an engagement begins

A Practical Path From Current Assumptions to Useful Labor Information

Start With the Current Method

Discuss the equipment, materials, staffing, production methods, estimating system, available data, and labor questions management is trying to answer.

Match the Standards to the Operation

Identify the relevant time elements and consider how they fit the conditions in which the work is performed.

Put the Information to Work

Use the selected labor standards to support the management decisions included in the engagement.

Scope note: TDC’s time standards are available with or without an onsite consultation. The starting conversation determines the appropriate scope, format, and level of support for the operation.

Current service and supporting guidance

Resources for Better Labor Clarity

Detailed Time-Standards Guidance

Learn more about Work Minutes, R.E., S.U., man-minutes, costing, scheduling, and related applications.
Read the detailed guidance

Board Foot vs. Work Minutes

See why time-based labor information can give management a clearer basis than material volume alone.
Read the comparison

TWE Truss WorkMinute Estimator

Explore Todd’s management-software application currently in development for truss manufacturers.
Explore TWE

Client experience

A Different Way to View Labor Decisions

“I came out of it with a completely different mindset on pricing, scheduling, and staffing.”

Shane Soule, President
ProTec · Read the full client story

Frequently asked questions

Before You Change Your Labor-Estimation Method

What are Work Minutes, R.E., S.U., and man-minutes?

They are time-based labor-estimation units used to express how much labor a defined task or production condition is expected to require. Terminology and setup vary by system and operation.

What decisions can labor time standards support?

They can provide clearer information for labor costing, scheduling, staffing, productivity measurement, pricing, and capacity planning.

Can the standards work with existing truss-estimating software?

Applicable labor-estimation systems may accept configurable labor factors. Compatibility, terminology, and setup vary, so the current system and operating requirements should be reviewed before changes are made.

Is an onsite consultation required?

Not necessarily. TDC’s published guidance states that time standards are available with or without an onsite consultation. The appropriate approach depends on the operation and the support needed.

Are labor standards fixed once they are installed?

No. Standards should be reviewed and updated when equipment, materials, layouts, staffing assumptions, or production methods change.

Do labor time standards guarantee a particular result?

No. They provide a clearer basis for management decisions. Results depend on appropriate setup, validation, operating conditions, and implementation.

What information is useful for the first conversation?

Current equipment, materials, staffing assumptions, production methods, labor-estimation approach, applicable system information, and examples of the costing, scheduling, productivity, or capacity questions management needs to answer.

Start with the current labor question

Where Are Labor Assumptions Limiting Better Decisions?

Describe how labor is currently estimated and where management needs greater clarity. Todd can discuss whether engineered labor time standards, a broader operational review, or another practical next step best fits the operation.

Back To Top